Loading...
HomeMy WebLinkAboutBLD00-032Wstermm & KsuHuilding 181 Quinry Stree4 Stile 301 Port Townsend WA 98368 Phone: (360)379-3308 Fsz: (360)379-6921 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-032R-1 Issued: 3114100 Job Address: 715 J Street Zoning: R-II Parcel Number: 984901002 & 984901004 Type: VV=N Occupancy: U-1 Nature of Work: Revision #1• change 9 foot wide eara¢e ouenine to 8 feet wide: use ABWP Bracin¢. Owner Scott Walker Contractor: G. W. Yakush GENERAL CONDITIONS APPLY -SEE LAST PAGE nL`nTTiuTi it rNCPF.("TTnNC APPRnVED/DATE 1\1'J - TEMPORARY EROSION & SEDIl~ZENT CONTROL See General Condition No 2 FOOTING k ~/~ ~0~ C s f Setbac Footings Forms Reinforcement LIFER FOUNDATION y7 /`~~~~ Stem Wall Forms Reinforcement Anchor bolts w 2"x 2"x 3/16" washers SLAB Monolithic Slab/Foundation at front wall; Alternate Braced Wall Panel holddawns Setbacks Forms Reinforcement Anchor Bolts • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of Z Permit M BI.DCO-037A-1 REQUIRED INSPECTIONS APPROVED/DATE FRAMING Walls Alternate Braced Wall Panel walls ~/S~/~U 1 [ Ceiling/Roof Ra$er/Tniss Positive Connection Weather Resistive Barrier FINAL f D Z~/~ Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's rePistration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be iastalkd on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and gravelcd construction entranea Adjacent rights-of-way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with roulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Rc~inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection call 385-2294, press 3. A Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspeMions are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Waterman & KatzBuilding 181 Quincy Strew, Suite 301 Port Toweaend, WA 98368 Phone: (360)319-3208 Fax: (360)379-6973 CITY OF PORT TOWNSEND U • CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number: BLDOO-O32 Issued: 3/08100 Job Address: 715 J Street Zoning: R-II Parcel Number: 984901002 & 984901004 Type: VV=N Occupancy: U-1 Nature of Work: Construct 280 square foot Garase Owner: Scott Walker Contractor: G. W. Yakush GENERAL CONDITIONS APPLY -SEE LAST PAGE ATi'l1TTTi?Ti Tl 7N.CPF!`TTl1NC APPRnVF.D/DATE TEMPORARY EROSION & SEDIlVIENT CONTROL See General Condition No 2 FOOTING Setbacks Footings Forms Reinforcement UFER FOUNDATION Stem Wall Forms Reinforcement Anchor bolts w 2"x 2"x 3/16" washers SLAB Monolithic Slab/Foundation at front wall; Engineered holdowns - 2400# capacity Setbacks Forms Reinforcement AnchofBolts Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 PamitMBLD00-032 REQUIRED INSPECTIONS APPRnVF:11/>nATR FRANIING refer to engineering and plans for engineered keader, sheathing, nailing and blocking NOTE: Engineered roof truss plan shall be on-site at time of inspection Walls Ceiling/Roof Rafter/Truss Positive Connection Weather Resistive Barrier FINAL Fi l B ildi [ ~ ~/0 na - u ng GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESCj measures shalt be installed on-site and inspected prior to beginning construction; caI1385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Publie Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works anoroval must be received oriar to scheduling the Building Deoartment's final inscection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility7ine locates 1-500-424-SSSS Page 2 of 2