CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-032R-1 Issued: 3114100
Job Address: 715 J Street Zoning: R-II
Parcel Number: 984901002 & 984901004
Type: VV=N Occupancy: U-1
Nature of Work: Revision #1• change 9 foot wide eara¢e ouenine to 8 feet wide: use ABWP Bracin¢.
Owner Scott Walker
Contractor: G. W. Yakush
GENERAL CONDITIONS APPLY -SEE LAST PAGE
nL`nTTiuTi it rNCPF.("TTnNC
APPRnVED/DATE
1\1'J -
TEMPORARY EROSION &
SEDIl~ZENT CONTROL
See General Condition No 2
FOOTING
k ~/~ ~0~
C
s
f Setbac
Footings
Forms
Reinforcement
LIFER
FOUNDATION y7 /`~~~~
Stem Wall
Forms
Reinforcement
Anchor bolts w 2"x 2"x 3/16" washers
SLAB
Monolithic Slab/Foundation at front wall;
Alternate Braced Wall Panel holddawns
Setbacks
Forms
Reinforcement
Anchor Bolts
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of Z
Permit M BI.DCO-037A-1
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
Walls
Alternate Braced Wall Panel walls ~/S~/~U
1 [
Ceiling/Roof
Ra$er/Tniss Positive Connection
Weather Resistive Barrier
FINAL f D Z~/~
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's rePistration
number and a Ciri business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be iastalkd on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
gravelcd construction entranea Adjacent rights-of-way shall be kept free of dirt & debris. Soils exposed
during construction shall be temporarily stabilized with roulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Rc~inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection call 385-2294, press 3. A
Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspeMions are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Waterman & KatzBuilding
181 Quincy Strew, Suite 301
Port Toweaend, WA 98368
Phone: (360)319-3208 Fax: (360)379-6973
CITY OF PORT TOWNSEND
U
•
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O32 Issued: 3/08100
Job Address: 715 J Street Zoning: R-II
Parcel Number: 984901002 & 984901004
Type: VV=N Occupancy: U-1
Nature of Work: Construct 280 square foot Garase
Owner: Scott Walker
Contractor: G. W. Yakush
GENERAL CONDITIONS APPLY -SEE LAST PAGE
ATi'l1TTTi?Ti Tl 7N.CPF!`TTl1NC
APPRnVF.D/DATE
TEMPORARY EROSION &
SEDIlVIENT CONTROL
See General Condition No 2
FOOTING
Setbacks
Footings
Forms
Reinforcement
UFER
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor bolts w 2"x 2"x 3/16" washers
SLAB
Monolithic Slab/Foundation at front wall;
Engineered holdowns - 2400# capacity
Setbacks
Forms
Reinforcement
AnchofBolts
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
PamitMBLD00-032
REQUIRED INSPECTIONS APPRnVF:11/>nATR
FRANIING refer to engineering and
plans for engineered keader, sheathing,
nailing and blocking
NOTE: Engineered roof truss plan shall be
on-site at time of inspection
Walls
Ceiling/Roof
Rafter/Truss Positive Connection
Weather Resistive Barrier
FINAL
Fi
l
B
ildi [ ~ ~/0
na
-
u
ng
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESCj measures shalt be installed on-site and inspected prior
to beginning construction; caI1385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed
during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Publie Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works anoroval must be received oriar to
scheduling the Building Deoartment's final inscection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility7ine locates
1-500-424-SSSS
Page 2 of 2