Permit Number: BLD00-030R-1 Issued: 5/09100 Parcel Number: 933-200.008
Job Address: 1104 Garfield Street Zoning R-11 Type: V-N Occupancy: R-3
Total Occupant Load: add 1 Nature of Work: Revise side setback to 10' from 5': change foundation to
conventional footing/concrete stem wall from CMU
Owner: Hollv & Drew Lohmann Contractor: Dave Johnson Construction
808-1152 cell
GENERAL CONDITIONS APPLY-SEE LAST PAGE
SEPARATE PERMTTS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
INSPECTIONS -see also original permit
FOOTINGS - no change ,S/lllw ~~
FOUNDATION -see also original permit
Stem Wall
~J~~/~ ~Q
Forms ( C `~~
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Vents -10 required
Crawl Access - in floor of existing house
Beam Pockets,
Alternate Braced Wall Panel holdowns
FLOOR FRAMING -see also original permit
Cripple Wall
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit K BID00-030R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a-Labor 8c Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils a:posed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspeMion report correMions are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection ca11385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE AFPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Waterman d KatzBuSding
181 Quincy Street, Suite 301
Part Townxod, WA 98368
Plwne: (360) 3793203 Fax (360) 385-7675
CITY OF PORT TOWNSEND
•
•
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: $LDOO-O3O Issued: 3/13/00 Parcel Number: 933-2002-008
Job Address: 1104 Garfield Street Zoning R-11 Type: V-N Occupancy: R-3
Total Occupant Load: add 1 Nature of Work: Move eaistina single-family residence, install new foundation
with 256 sa. ft. addition
Owner: Hollv & Drew Lohmann Contractor: Dave Johnson Construction
808-1152 cell
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.nTrruF.n TN~PFC'TTnNS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition #2
Drive OffMat to prevent sediment from leaving
the site
FOOTINGS ~/l~Ql~ ~~'
Setbacks
Footings
Forms
Reinforcement
Interior Footings
LTFER
FOUNDATION
Stem Wall - CMU
Forms
Reinforcement -bond beam @ top of wall
Anchor Bolts w/ 2" x 2" x 3/16" squaze washers
Vents -10 required
Crawl Access - in floor of existing house
Beam Pockets
Alternate Braced Wall Panel holdowns
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit # HLD00-030
REQUIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
Girders
Joists
Blocking
Positive Connection
Treated Wood to Concrete
Anchor Bolts & Washers
Shield Under Posts
Beam Pockets
Girder to Concrete
Anchot Bolts & Washers
FDN Vents
PLUMBING:
Rough-In (D-V-T & Clean Outs) / ~ _ (~
~ Z ~ ~ (vj /
/
,
Water Supply l
/
Water Hammer Arrestor ~ clothes & dishwasher
Hose Bibs (backfiow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
MECHANICAL
Heat Pump -manufacturer's installation
~~, a __ _ „ O~
'"`
instructions to be on-site at time of inspection ~
~
~
- Integrated fresh air with R-4 insulation on
fresh air duct if installed within heated ,~/L ~~D~ ~ p
(J</
space
- Duct and duct insulation - 6" minimum
smooth duct for 2 bedrooms; 7" for 3, etc.
- Damper; electric damper requires letter
from installer at final
Kitchen Fan -100 cfin
Environmental Air Exhaust ducting (with
backdraft dampers), insulation (R-4) and
terminus (located 3' from opening)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Permit#BLD00-030
a
RFfITTTRFTI TNRPF.("TT(1NS APPRnVED/DATE
FRAMING: v---- -- - - - -- - - -
Walls ~~
/J
(/~~~
Roof ~Z
6 0
Venting @ enclosed ceiling joists
Ceilings
Posts, beams & headers
Windows -safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on
windows & doors at inspection time
Air Seal
Rafter/Joist Positive Connection
Fire Blocking
Weather Resistive Barrier
INSULATION ~
~
Floor (R-25) ~~~
7
~
Wall(R-19)
Ceiling (R-30 )
Ba131es
Vapor Bamer: V. B. paint/faced batts/4 mil poly
Crawl Space - 6 mil black poly
DRY WALL NAILING
Walls {
g~6 ~~~
Ceiling L
Interior Braced Wall Panel
FINAL
House Number -check for 5" numbers
Deck
Plumbing
MechanicaUHeating
Fresh Air Certification
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors throughout -one in each
sleeping room and in each hallway/area leading to
sleeping rooms with a minimum of one (1) on each
.~oor
Final -Building
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permit %BLD00.030
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt'
debris.' Soils eaposed during construMion shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspeMion prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Bu7ding Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All budding permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the Geld. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates