Loading...
HomeMy WebLinkAboutBLD00-027F1 Ce • Waterman & Katz Building 181 Quincy Street Suite 301 Port Townund WA98368 Phone (360) 379-3208 Fax (360) 379.6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD~~-027 Job Address: 789 Ouincv Street Total Occupant Load: N!C Owner: Stuart Lochner Issued: 2124100 Parcel Number: 988800307 Zoning: RR=II Type: VV=N Occupancy: R_3 Nature of Work: Foundation Replacement Contractor: To be determined -See Condition #I GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.fIiiTRF.T) iNCPF('TTfINC APPR()VED/DATE DEMOLITION Materials to be transported to Jefferson County landfill or other approved site in conformance with all state and local regulations and ordinances. FOOTINGS Setbacks - exisring non-conforming setbacks at ~~~~ ~~t~ S ~~~~~~ '-C stair entries Footings LCix-1-~ta~ ~~,~~, ~`O~O~ Forms Reinforcement Interior Footings Chimney Foundation Stair/Porch Piers FOUNDATION l ll =~TE~~02 ~avt.-I~uGS // ~/~ 7/~~l~U `-'~-- Cripp e Wa Reinforcement 3 #4s continuous at perimeter wait `~ ~~*~°l /~ ~Ex/ru~i4T'ioi/ Y/~GfO ~ Anchor Bolts @ 36" o. c. at perimeter @ 32" at interior footings Alternative CMU Stemwall Foundation Ventilation - 15 vents req'd Crawl Access Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Building Permit #00-027 REOUII2ED INSPECTIONS APPROVED/DATE FLOOR FRAMING Girders to concrete mists / ~ ~ ~~~ Positive Connection / Blocking Shield Under Posts Treated Wood to Concrete Anchor Boits & Washers INSULATION Floor (fill existing joist bays) ~ / ~ l q ~'1 ~ 6 mil black vapor barrier in crawl space Pipe Insulation - R-3 FINAL Sta'vs/Handrails [ n f /~ /] ,(~,~ l1 1/ House Number / / !v~* lSS'~ ~`"~f Smoke Detectors -required throughout existing I \ House per UBC; one in each sleeping room and each area/hallway leading to sleeping room with minimum one detector each floor; battery powered okay. Building 1 r Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Building Permit #00-027 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-oi way shall be kept free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required Public Works anoroval must be received nrior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 3