HomeMy WebLinkAboutBLD00-026Waterman & Katz Building
1 B] Quinry Street, Suite 301
Pon 7ou~naend, WA 98368
Plwrx: (360)379-5086 Fax: (360)3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST $E POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O26R-4 Issued: 02/09/01 Parcel Number: 948320601
Job Address: 800 Hancock Street Zoning: R-IV Type: V=N Occupancy: N/A
Nature of Work: Revision #4: Construct transit shelter (bv PT Hieh School students)
Owner: Dou¢las Riebv Contractor; Cavette Construction
206/275-3275 206/650-5693 (cell) 301-0527
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
•
N TE: See also Original Inspection Record
RF,nTTTRF,n TNSPF.CTTONS
APPROVED/DATE
MONOLITHIC SLAB
Setbacks
Forms
Reinforcement
Engineered Holdowns
FRAMING -all engineering connections require
inspection prior to cover
Walls
Roof/Ceilings
Weather Resistive Barrier
FINAL
Barrier Free Design
Final -Building
j ~/ °7 F~~ Y/~
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
Permit # BLD0140]6RA
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on-
site and inspected prior to beginning construction; ca11385-2294, press 3. Measures may include
installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free
of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction
is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspeMion is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is repaired Public Works approval must be received nrior to
scheduline the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval arior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2
Watermm $ KelzBuilmng
181 Quincy S4M, Suita 301
PatTownxM, WA 98366
Phone: (360)379-5086 Fez: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O26R-3 B~dg. #B Issued: 9/29'/00 Parcel Number: 948320601
Job Address: 800 Hancock Street Zoning: R-IV Type: V 1-hour Occupancy: R-1
Nature of Work: Revision #3: provide wet sienature for tirestop details per UL #FC2034 Tor 4" or smaller
ABS pipe• provide one-hour rated floor/ceiling assembly per design #TJM/FCA 60.10; provide alternate
Owner: Douelas Rieby Total Occupant Load: 48: 24 per level Contractor: Cavette Construction
206/275-3275 206/650-5693 (cell)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
• NOTE.' See also Original Inspection Record and Fire Department Memo dated 2/24/00
REQUIRED INSPECTIONS
APPROVEDNATE
FRAMING -all other inspections per original
inspection record; one-hourfre-resistive
construction throughout required per UBC
Section310.2.2
Floor/Ceiling -one-hour assembly per attached details
Roof/Ceilings -one-hour per attached details
Firestopping -per attached details
DRY WALL NAILING -one-hour rating throughout ~,G%~. 7~"'t' ~ ~~ ~ ~~~/~
C
Floor/Ceiling -per approved details j,
Roof/Soffits -per approved details
FINAL -see original inspection record
D ~~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page I of 2
Permit M SLD00-026R-3
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished
2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on-
site and inspected prior to beginning construction; ca11385-2294, press 3. Measures may include
installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free
of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction
is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report correMions are completed.
6. The Building Department is unable to pass final inspection on your projecfuntil Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received urior to
scheduling the Building DenartmenYs final insnection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for. at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS,
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
.~., - -
Waterman ~ Katz Bwldieg
181 Quinry Street, Suim 301
Port Towreend, WA 98368
Phone: (360)379-5086 Fsm: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-O26R-1 BId~. #B Issued: 9118!00 Parcel Number: 948320601
Job Address: 800 Hancock Street Zoning: R-IV Type: V 1-hour Occupancy: R-1
Nature of Work: Revision #1• Remove area separation wall requirement by redesigning buildings to meet
setback r~rements for individual buildings• eliminate F-2 walkway connection; provide accessible
Owner: Douglas Rigby Total Occupant Load: 48; 24 per level Contractor: Cavette Construction
206/275-3275 206/650-5693 (cell)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
l~ Tla: See also Original Inspection Record and Fire Department Memo dated 2/24/00
RFf1TTTRFTI TNCPF('TT(1NS
APPROVED/DATE
FOOTINGS
Deck footings and exit balcony footings inspected 6/8/00
by Mike Ajax, interim building inspector
FRAMING -all other inspections per original
inspection record; one-hourfre-resistive
construction throughout required per UBC
Sectian310.2.2
Walls - I-hour rated exterior wall construction per
calculations by Fire Protection Engineer
Area Separation Wall -not required due to
separation of buildings on property
Floor/Ceiling -one-hour assembly per attached details
Roof/Ceilings -one-hour per attached details
Attic draft stops
Fire Blocking
Firestopping -per attached details
CaIJ 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
GA File #FC5406 details for one-hour rated trussed ceiling/roof
Permit N aIDW-026a-1
REQUIRED INSPECTIONS APPROVED/DATE
INSULATION
Walls - veri~ per Fire Protection Engineer requirements
Floor/Ceiling -per rated assembly details
DRY WALL NAILING -one-hour rating throughout
Walls -1-hour construction throughout
Floor/Ceiling. -one-hour rating required
Rool7Soffits -one -hour rating required
I-Hr. Separation between dwelling units
Draft stops
Atea Separation -not required due to revised separation
of buildings on property
FINAL
Bamer Free Facilities Design & Access @ Laundry
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on-
site and inspected prior to beginning construction; ca11385-2294, press 3. Measures may include
installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free
of dirt debris. Soils eaposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction
is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice. is required. Public Works approval must be received arior to
scheduling the Building Deaartment's final inspection.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Permit X BLD00-0268-1
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project,
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval riot to making changes in the 5eld. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
i
•
Wstertnen & Katz Building
181 Quincy Stmet, Suite 301
Pon Towuscod, WA 98366
Pbone: (360)379.5086 Fax: (360)385-7615
CITY OF PORT TOWNSEND
r
C
-~ CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STI'E
Call 385-2294 for Inspection
~j~~3,.zoG-~ ~
Permit Number: BLDOO-O26 Bldg. #B Issued: 4/6/00 Parcel Number.^-08103-20~2
Job Address: 800 Hsncock Street Zoning: R-IV Type: V 1-hour Occupancy: R-1
Total Occupant Losd: 48: 24 oer level Nature of Work: Construct 18 unit aaartment comolez
Owner: Douglas Riebv ContrsMor: Csvette ConstruMion
206/275-3275 206/650-5693 (cell)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Revision Required for Area Separation Wall
Electrical -Contact Labor & Industries @ 360-417-2702
I~Q :See also Fire Department Memo daied 2/24/00
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL(TESC)
Per approved engineered plan
TESC Inspection required prior to construction
GROUNDWORK PLUMBING
Pressure test
Pipe joints exposed
Pipe bedding
FOOTINGS -refer to structural plans, sheets S-2
and S-S
~
~
~~ ~
S
/ o.~
~ ~ ~
Setbacks
FOrmSgs j-'ITtl ~ti S7T~-gat G~7
~J ta. lJe~~
Reinforcement - #5 per sheet S-2 1
~ (~ ~A' 681 Zeo.
Interior Footings/Thickened Slab Footings
Stair Piers
LIFER
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 5
RE UIRED INSPECTIONS APPROVED/DATE
Pmmi[ # HLD00-M6
FOUNDATION
R-10 insulation at perimeter
Stem Wall ~ A f ~~ ~ ~~ll/~Q~~ .`
~~~
d
N
1~'- `f
Forms [.
(J
I
/
Reinforcement
Anchor Bolts -see Sheet--6 for anchor bolt
spacing at shear walls
Engineered holdowns per approved plans, sheets
S-3 and ,~6
SLAB
Thickened footings & reinforcement
Anchor Bolts -per shear wall schedule
Column Bases
PLUMBING: J~UD~jL (0 /ZQf/~
Rough-In (D-V-T & Cln Outs)
Floor drains n n
~~rZ-~~ ("~/ ,
~~
~~
Water Supply \///
~
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection req'd)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under on concrete slab
Seismic Restraint - 2 places
Pressure relief valve drain to exterior -
Barrier-Free Required -one Type A; all other on
level one, Type B units
MECHANICAL -electric heat; building complies
prescriptively
Fire/Smoke Dampers (See Fire Department for
inspection)
Whole House Fans - 1:5 Bones max., with manual
and automatic timer
Kitchen fan - 100 cfm
Environmental air exhaust ducting, insulation (R-4),
and terminus (3' from openings into building)
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 5
•
s
t
RE UIRED INSPECTIONS APPROVED/DATE
Permit N BLD00~026
FRAMING - SUDP issued prior to framing
Walls -1-hour construction throughout
Engineered Shear Walls
Area Separation Wall
Ceilings
Roof-Roof connection details, sheet S-8;
pre-engineered truss plan required to be
on-site at time offraming inspection
Attic access
Attic draft stops
Attic Venting
Posts, beams & headers -see Sheets S-6 & S-7
Windows -escape
Windows -safety glazing
Windows Ufactor - .43 or better
NFRC window sticker must be on
windows at inspection time
Air Seal
Fresh Air -window ports
Doors -undercut'/a" for fresh air
Door UFactor - .20 or better
Rafter/Truss Positive Connection
Fire Blocking
Firestopping
Weather Resistive Barrier
INSULATION
Foundation perimeter R-10
Wall R-19
Ceiling R-38
Baffles
Vapor Barrier: faced Batts in walls
DRY WALL NAILING
Walls - 1-hour construction throughout
~`//~i~[~ / li
1 Hr. Separation between dwelling units (-/l
Draft stops
Area Separation
LIGHTING -laundry facility
Per NIZEC Lighting Power allowance or
prescriptive path
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
REQUIRED INSPECTIONS APPROVED/DATE
Pamil M BLD00-026
LANDSCAPING, PARKING & EXTERIOR
LIGHTING
Call 7effItandall(BCD) for inspection @
379-5081
FINAL
Fire Department Sign-Off
Public Works Sign-Off
Electrical Sign-Off (L&I)
Building Numbers
Plumbing
MechanicaUHeating
Insulation Certificate
Smoke Detectors
Bamer Free Access
Final -Buildin
/~~
g ~ ~~ ~ ~ ~ ~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on-
site and inspeMed prior to beginning construction; ca1138S2294, press 3. Measures may include
installation of silt fencing and graveled construction entrance. Adjacent rights-of-way shall be kept free
of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall. be permanently stabilized with seeding, plantings, sodding, etc. once construction
is complete. Applicant is responsible for proteMion of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner orowner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385.2294, press 3. A
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
Permit # BI.D00-tr26
•
t
7. Finsl Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the Feld. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10, POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before ou di for utili line locates
Y g tY
1-800-424-5555
Page 5 of 5
s
•
w.wm.~ t Ic.tzanfwing
181 Qumry 3veef, Sure 301
Port Towiuad, wA 98368
Phone: (360)3-A-5086 FaB: (3611) 385-7b75
s
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
BLD00-026 Bld ~~~j,~`~`~
Permit Number: ~. #B Issued: 5/16/00 Parcel Number:•89t9~iSb>`2
Job Address: 800 Hancock Street Zoning: R-IV Type: V 1-hour Occupancy: R-1
Total Occupant Load: 48: 24 oer level Nature of Work: Revision #2: Revised F3 footine and F-2 framing
Owner• Douelas Rieby Contractor: Cavette Construction
20b/275-3275 206/650-5693 (cell)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Revision Required for Area Separation Wall
Electrical -Contact Labor & Industries @ 3b0-417-2702
NOTE: See also Fire Department Mema dated 2/24/00
A T'i l1TTTRFTI TN.CPF.!"TT(1NC
APPROVED/DATE
SLABv
Thickened footings & reinforcement - F-3 footing
revised from continuous to 2 interiorfootings
FRAMING
Columns, holdowns and shear walls revised @ F-2
FINAL -see original permit
Fina3 -Building
i
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page I of 2
Permit A B7,D00-d26Q-1
i
GENERAL CONDITIONS
1. Contractors working on this project are required to have s Labor & Industries contractor's registration
number and a Ciri business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on-
site and inspected prior to beginning construction; ca11385-2294, press 3. Measures may include
installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free
of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction
is complete, Applicant is responsible for protection of adjacent properties.
3, All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to saver.
4, Owner or owner's agent shall review and oversee correction of any and all deficiencies noted 6y required
inspections.
5, Re-inspection is required after inspection report corrections are completed.
6, The Building Department is unable. to pass final inspection on your project until Public Works _
requirements have been completed and inspected. Far Public Works inspection ca11385-2294, press 3. A
7, Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits ezpire if no progress bas been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval for to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
w~.~ ~ x~swia~~
iei Qu~~r seen, swu; 3oi
Potl Taweaend, WA 98368
Plwro: (360)379-5086 F.x: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD I
r THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
I Call 385-2294 for Inspection
Permit Number: BLDOO-O26R-3 BICIg. #A Issued: 9/29'/00 Parcel Number: 948320601
Job Address: 800 Hancock Street Zoning: R-IV Type: V 1-hour Occupancy: R-1
Owner: Dou¢las Ri2by Total Occupant Load: 48: 24 ner level
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Contractor: Cavette Construction
206/275-3275 206/650-5693 (cell)
NOTE: See also Original Inspection Record and Fire Department Memo dated 2/24/00
RE UIRED INSPECTIONS
APPRO VED/DATE
FRAMING -all other inspections per original
inspection record; one-hourfire-resistive
construction throughout required per UBC
Section310.2.2
Floor/Ceiling -one-hour assembly per attached details
Roof/Ceilings -one-hour per attached details
Firestopping -per attached details
DRY WALL NAILING -one-hour rating throughout ~d ~~~ ~~trtti, ~ h
Floor/Ceiling -per approved details
Roof/Soffits -per approved details ~"`"°''>
`~/2~/~ ~~
F ` '~
FINAL -see original inspection record
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
', ~ ,~~
~~ a acnoo-ozca-s
GENERAL CONDITIONS
1. Contractors working on this projeM are required to have a Labor & Industries contractor's reeistration~
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on-
site and inspected prior to beginning construction; call 385-2294, press 3. Measures may include
installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free
of dirt debris. Soils ezposed during construMion shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction
is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns,.sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all. deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
7. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. A11 building permits ezpire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval arior to making changes in the field. Contact the Building
Department at 379-5086 arior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2
~ Waterman & KatzBmlding
181 Qwncy Street, Suite 301
Port Towruend, WA 98368
Phone: (360)379-5086 Fac (360)385.7675
• CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O26R-1 B~d~. #1~ Issued: 9/18/00 Parcel Number: 948320601
Job Address: 800 Hancock Street Zoning: R-IV Type: V 1-hour Occupancy: R-1
Nature bf
assembly Per UL #L530 details• engineered details for stairwell and exit balcony footings: UL #P522 and
GA File #FC5406 details for one-hour rated trussed ceiling/roof
Owner: Douglas Rigby Total Occupant Load: 48; 24 oer level Contractor: Cavette Construction
206/275-3275 206/650-5693 (cell)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
--~ C . D - Zssoz~ Z/~'0' C.~
SEPARATE PERMITS REOUHtED: ~ Q l
• Electrical -Contact Labor & Industries @ 360-417-2702 E~p1RGi ~o yL~a~ ~~
t%~
. N07'E: See also Original Inspection Record and Fire Department Memo dated 2/24/00
1?T'f1TTTi?F7) 7NCPF("TTl1N.C
i
APPRnVF'll/T)ATF.
FOOTINGS
Deck footings and exit balcony footings inspected 6/8/00
by Mike Ajax, interim building inspector
FRAMING - al! other inspections per original ~~/~/~
inspection record; one-hourfre-resistive
construction throughoutrequired per UBC
Section310.2.2
Walls - 1-hour rated exterior wall construction per
calculations gy Fire Protection Engineer
Area Separation Wall -not required due to
separation of buildings on property
Floor/Ceiling -one-hour assembly per attached details
Roof/Ceilings -one-hour per attached details
Attic draft stops
Fire Blocking
Firestopping -per attached details
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
REQUIRED INSPECTIONS
INSULATION
Walls - verb per Fire Protection Engineer requirements
F1oodCeiling -per rated assembly details
DRY WALL NAILING -one-hour rating throughout
Walls - ]-hour construction throughout
FloodCeiling -one-hour rating required
RooflSoft-its -one -hour rating required
I-Hr. Separation between dwelling units
Draft stops
Area Separation -not required due to revised separation
of buildings on property
FINAL
Barrier Free Facilities Design & Access @ Laundry
Final -Building
Pmnit %BID00-026a-1
APPROVED/DATE
' z GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on-
site and inspected prior to beginning construction;. ca11385-2294, press 3. Measures may include
installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept tree
of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction
is complete. Applicant is responsible for protection of adjacent properties.
3. AlI elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenri-four hours notice is required Public Works aaoroval must be received prior to
scheduling the Building Department's final inspection.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 3
r
•
w
Permit M BLD00-0268-1
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 riot to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
•
•
Call 48 hours before you dig for utility line locates
1-500-424-5555
Page 3 of 3
Waterman & Katz Building
781 Quincy StreG, Suite 301
Pon Towrucnd, WA 96368
Phone: (360)379-5086 Faz: (360)385-7675
nT•rv /'1~ nl1D'-rt ~7''ll~F7ATCL'1~TT1
Vl1 1 Vl~ 1 Vl\1 1 V n' L\Jl]L~L
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Cat1385-2294 for Inspection
9~g3ze r~ol
Permit Number: BLDOO-O26 Bld!?. #A Issued: 4/6l~ Parcel Number: 2-
Job Address: 800 Hancock Street Zoning: R-IV Type: V 1-hour Occupancy: R-1
Total Occupant Load: 48: 24 oer level Nature of Work: Construct 18 unit auartment comnlea
Owner: Douglas Rigby Contractor: Cavette Construction
206/275-3275 206/650-5693 (celn
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTI'S REOUIItED:
Revision Required for Area Separation Wall
Electrical -Contact Labor & Industries @ 360-417-2702
~E: See also Fire Department Memo dated 2/24/00
._~ RE UIItED INSPECTIONS APPROVED/DATE
TEMP EROSION & SDM'T CONTROL(TESC)
Per apprrned engineered plan
TESC Inspection required prior to construction
GROUNDWORK PLUMBING
Pressure test ~ `L~~~ ~~
l ...i
Pipe joints exposed l
Pipe bedding
FOOTINGS -refer to structural plans, sheets S-2
and S-5 l~ no..~ B ~q~
Setbacks
Footings
(~~~~(~
Forms
Reinforcement - #5 per sheet S-2
Interior Footings/Thickened Slab Footings
L~l/~l//~~J ~~~ ~/l ~,~D (`~
Stair Piers
UFER
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 5
REQUIRED INSPECTIONS
APPROVED/DATE
~cxstooo.azs
FOUNDATION
R-10 insulation at perimeter
5/D~
stem wall
Forms /
l
Reinforcemem
Anchor Bolts -see Sheet-6 for anchor bolt
spacing at shear walls
Engineered holdowns per approved plans, sheets
S-3 and S-6
SLAB
Thickened footings & reinforcement
Anchor Bolts -per shear wall schedule
Column Bases
PLUMBING:
Rough-In (D-V-T & Cln Outs)
Floor drains
Water Supply
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection req'd)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under on concrete slab
Seismic Restraint - 2 places
Pressure relief valve drain to exterior -
Barrier-Free Required -one Type A; all other on
level one, Type B units
MECHANICAL -electric heat; building corapiies
prescriptively
Fire/Smoke Dampers (See Fire Department for
inspection)
Whole House Fans - 1.5 sones max., with manual
and automatic timer
Kitchen fan - 100 cfm
Environmental air exhaust ducting, insulation (R-4),
and terminus (3' from openings into building)
F
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
s
•
J
D L'l1T TTD Ti n TNCDTi f TT(lNC APPR(1VF.n/DATE
Permit#HLD00-026
_.. .,~._...L ~
FRADIING - Si7DP issued prior to framing ----- -
Walls - 1-hour construction throughout
Engineered Shear Walls
Area Separation Wall
Ceilings
Roof-Roof connection details, sheet S-8;
pre-engineered truss plan required to be
on-site at time of framing inspecfron
Attic access
Attic draft stops
Attic Venting
Posts, beams & headers -see Sheets S-6 & S-7
Windows -escape
Windows -safety glazing
Windows Ufactor - .43 or better
NFRC window sticker must be on
windows at inspection time
Air Seal
Fresh Air -window ports
Doots -undercut 11/z" for fresh air
Door UFactor - .20 or better
Rafter/Truss Positive Connection
Fire Blocking
Firestopping
Weather Resistive Barrier
-7
~~15 ~ ~ ! s ~7~o-QS
~t~l5~~c~ s-~ o"~' S'M,~1 ~ti~~~~
i
~~cSI~ES~~i~.~ GIGM~l~2~o.,c 8IZ3 n~
INSULATION
0
i 2 r~ ~ a Jl~~ ~,
("1
Foundation per
meter R-1 '
Wall R-19
Ceiling R-38
Baffles
Vapor Barrier: faced Batts in walls
DRY WALL NAILING ~ (,PUK/~ ~Prl'Z~~'t1
"
_
~~
Walls - 1-hour construction throughout //
~
1 Hr. Separation between dwelling units `
Draft stops
Area Separation
LIGHTING -laundry facility
Per NREC Lighting Power allowance or
prescripfive path
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
RE UIRED INSPECTIONS APPROVED/DATE
Pamif #BLDOO~M6
LANDSCAPING, PARHING & EXTERIOR
LIGHTING
Call Jeff Randall (BCD) for inspection @
379-5081
FINAL
Fire Department Sign-Off
Public Works Sign-Off
Electrical Sign-Off(LBcn
Building Numbers
Plumbing
Mechanical/Heating
Insulation Certificate
Smoke Detectors
Barrier Free.Access
Final -Building
~ Z ~~ ~Z
GENERAL CONDITIONS
i
1. Contractors working on this project are required to have s Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on-
site and inspected prior to beginning construction; call 385-2294, press 3. Measures may include
installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free
of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction
is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspeMion report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
.requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 4 of 5
Permit#BLD00-026
t
s
f
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval urior to making changes in the field. Contact the Building
Department at 379-SOS6 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
i Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5
..
i
t