HomeMy WebLinkAboutBLD00-024Wafennan & Katz Building
181 Quincy Street Suite 301
Phony (360)379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
r
u
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-O24 Issued: 2/17!00 Parcel Number: 988802002
Job Address: 514 Blaine Street Zoning: RR=II Type: VV=N Occupancy: R-3tU-1
Total Occupant Load: NC Nature of Work: Foundation & foist reaair/Renlace two windows
Owner: Barnev Burke Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REOTTIRED INSPECTIONS
APPROVED/DATE
FOOTINGS
Pier Footings in existing slab
~ /Z 3/U ~j
Forms I/ /
Reinforcement
Positive connection at post base
Positive connection at girder
FOUNDATION I
~
Foundation Ventilation - I S vents required j f U
Z~ Z
FLOOR FRAII~IING
joists
2~2 3/0(7
Positive Connection
Treated Wood to Concrete
Shield under Posts
FRAMING
Z 3l ~
~/
Window U-factor - . 40 or better l
Air Seal ~
n
;
~
(
,~
INSULATION
Floor (fill new joist bays )
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
s~aa~s ~rt #BLOOO-0za
REOUIltED INSPECTIONS
FINAL
House Number -check for 5" numbers
Smoke Detectors throughout (battery powered
okay in existing construction)
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details}. Adjacent rights-of-way shall be kept
free of dirt and debris. Sails exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover. _
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted b~
required inspections.
5. Re-inspection is required after inspeMion report corrections are completed.
6. The Building Department is unable to pass final inspection on your prajtct until Public Works
requirements have been completed and inspected For Public Works inspection ca11385-2294, press 3.
A minimum of twenty-four hours notice is required Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress bas been made within sia months, or if na inspections are
done by the Building Department within one year. Call for at (east one inspection per year to keep your
building permit active.
9. Revisions to the approved plans require approval prior to making changes in the field.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2