Loading...
HomeMy WebLinkAboutBLD00-024Wafennan & Katz Building 181 Quincy Street Suite 301 Phony (360)379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND r u CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-O24 Issued: 2/17!00 Parcel Number: 988802002 Job Address: 514 Blaine Street Zoning: RR=II Type: VV=N Occupancy: R-3tU-1 Total Occupant Load: NC Nature of Work: Foundation & foist reaair/Renlace two windows Owner: Barnev Burke Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REOTTIRED INSPECTIONS APPROVED/DATE FOOTINGS Pier Footings in existing slab ~ /Z 3/U ~j Forms I/ / Reinforcement Positive connection at post base Positive connection at girder FOUNDATION I ~ Foundation Ventilation - I S vents required j f U Z~ Z FLOOR FRAII~IING joists 2~2 3/0(7 Positive Connection Treated Wood to Concrete Shield under Posts FRAMING Z 3l ~ ~/ Window U-factor - . 40 or better l Air Seal ~ n ; ~ ( ,~ INSULATION Floor (fill new joist bays ) Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 s~aa~s ~rt #BLOOO-0za REOUIltED INSPECTIONS FINAL House Number -check for 5" numbers Smoke Detectors throughout (battery powered okay in existing construction) Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details}. Adjacent rights-of-way shall be kept free of dirt and debris. Sails exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. _ 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted b~ required inspections. 5. Re-inspection is required after inspeMion report corrections are completed. 6. The Building Department is unable to pass final inspection on your prajtct until Public Works requirements have been completed and inspected For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress bas been made within sia months, or if na inspections are done by the Building Department within one year. Call for at (east one inspection per year to keep your building permit active. 9. Revisions to the approved plans require approval prior to making changes in the field. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2