Loading...
HomeMy WebLinkAboutBLD00-022~e W o4rmno & Katz BuiWlne 181 Quinry Strte4 Su14301 Port Towotend, WA 98368 PMne: 3603793208 Poz 3603794923 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385=2294 for Inspection Permit Number: BLDOO-O22 Issued: 2/17/0o Parcel Number: 974-100-903 & 974-100.904 Job Address: 1606 Tav lor Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: 4 Nature of Work: Addition to Single-Family Dwelling Owner: Jan. & John Zimmer Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition #2 Silt Fence as needed Drive Off Mat per attached details FOOTINGS Setbacks ),y2$~ ~ / / (/l'/ U~ Footings ll` Forms Reinforcement FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts w/ Z" x 2" x 3/16" square washers Vents - 5 required Crawl Access Beam Pocket Alternate braced wall panel (ABWP) holdowns Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Building Permit NBL1N10-022 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING NOTE: Engineered plan to be on-site @ time of inspection Girders Joists - Blocking Shield under Posts Positive Connections Girder to Concrete Treated Wood to Concrete Anchor Bolts & Washers PLUMBING: Rough-In (D-V-T & Clean Outs). Water Supply Hose Bibs (backflow protection required.) Pipe Insulation - R-3. Pressure Reduction Valve if> 80 psi MECHANICAL Whole House Fan -Master Bath ~7/OL Environmental Air Exhaust ducting, insulation ~ (R-4) and terminus (located 3' from opening) FRAMING Walls ?J/Z'//~ Sheer Wall Nailing /c Alternate Braced Wall Panel Roof -Engineered plan to be on-site at time of inspection Attic Venting -air baffle Ceilings Posts, beams & headers Windows -egress Windows -safety glazing Windows Ufactor - .39 or better, new windows NFRC window sticker must be on windows & doors at inspection time Air Seal Fresh Air -Wall Ports Required Doors Ufactor - .20 max. Rafter/Truss Positive Connection Fire Blocking Weather Resistive Barrier Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Building Pmnii #BLDOOd22 RF(ITTTRF.n TNSPFC'TiONS INSULATION 30 Fl R ~ , J„Q~, , ~ ~'~~ 90Y ~t/r 'l'y ; ) oor ( - cC,ur ,, ` p Wall (R-14 ) Ceiling (R-38 ) Vapor Bamer Crawl space - 6 mil. black poly DRY WALL NAILING , / ~'/ ~ ~ 7 Wails Ceiling Interior Braced Wall Panels FINAL House Number Plumbing Mechanical Smoke Detectors *Battery powered OK in existing construction Final -Building APPROVED/DATE GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & fndustries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut dawn while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning canstrucion; cat1385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required aker any corrections are completed. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #BI,D00-022 ' 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3;~ minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. ~-w- Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 4 of 4