Loading...
HomeMy WebLinkAboutBLD00-021r ~ '- CITY OF PORT TOWNSEND Wataemm & Ke1z Huildiog 181 Q~oY SItaM, Suite 301 Port Tow,ueod, WA98368 Photo: (360) 379-3208 Fuc: (360) 379.6923 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-O21R-2 Issued: 3!7!00 Parcel Number: 951902704 Job Address: 4901 Emerald Court Zoning: R-I Type: VV=N Occupancy: U-1 Nature of Work: Revision #2• increase Qaraee size, move bouse and raraee sia feet on site Ulan. Setbacks OK Owner:. Steve & Amv Wilfon2 Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RR(1TTTRFII TNCPRCTT(1NS APPROVED/DATE See original permit BLD00-021 for house ~ (~. ~~~~, C'A~vvrL r~a~J construction, and BLD00-021R-I for garage construction ~ r~~~ _ /1 r ~/ . ~ FOUNDATION ~j /8~~ Alternate Braced Wa11 Panels FINAL Final -Building (refer to BLD00-021R-1 ction) onstr f e ~ ~ /'~ ~ Ilt¢. ~ $ I Z'~~ - or garag c u V Call 48 hours before you dig for utility line locates 1-500-424-5555 Page 1 of 2 e Pmnit # BLD00-021R•2 GENERAL CONDITIONS L. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is aecomp6shed. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ea11365-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of-way shall be kept free of dirt 8c debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowna, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspeMion report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294,. press 3. A 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Citq of Port Townsend L.P.G. Certificate Of Ins on ~~aller: Permittee:~~G~aN~ ST~'//E o~.wrtq Mlw~ W.91rr Lp Pnar Mechanical Permit No.: Building Fermit No.: BG.~aD-a2/ IiLStallatiDn Type: r.~'New ^ Container Change Only ^ Other: Installation Data: • Historical District Determination: ~lA • U.B.C. Use Classification: ,~ 3 • Elements: 0 container(s) Piping O Appliance(s) ^ • Container Size/I'ype: /?~ G . /~G12 • Container Serial NoJMir. Dt.: Ssno~l/3~' - / 98/ • Other tank(s) Type, Size, SB: .vQN _ • Test Pressure,Type: ?~a'.Oi2 • Appliance Mfr.(s)/Model/SN(s): ~co Location(s): • Listing(s): • Venting TypelL.oc.: • Miscellaneous: In soectlon Elements: • Container(s) • Piping • Regulator(s) • Apurtenances • Setbacks • Appliance(s) • venting • Other ra- a C~ ^ ^ ^ ~ ^ ^ ~ rv R rvi roved conditional Approval: N19 _ ~~ a ' J ):r-~2o~t-? Plot Plan TLSE NdIF '~ v' -- -- Comment! Code Reference ~ifri/dii yNG/L Ne7 1N~[ uDfD ~ot approved: inspected ev: `~;~ Date: ~/~ /~U w~... 'T .~tirnaz~~ Time: vKaw ~+ ~~ ~~~ Port Townsend Fite Deparmtent - LPG Inspection Form - 05/12198 ~~ Waterman $ RatzHtrilding 181 Quinry Street, Suite 301 Port TouvaeeQ WA 98368 PMne: (360)379-3208 Fez: (360)379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-021R-1 Issued: 2/21/00 Parcel Number: 951902704 Job Address: 4901 Emerald Court Zoning: R-I Type: VV=N Occupancy: U-1 Nature of Work: Construct Garage; refer to permit # BLD00-021 for house construction Owner: Steve & Amy Wiffong Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RFnTTTRF,T) TNSPF,CTTnNS APPRnVF,T)/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No 2 FOOTING -See Sheet 8 of plans ~lgl o a Setbacks Footings Forms Reinforcement LIFER FOUNDATION Stem Wall ~l 1~~0~ Forms Reinforcement Anchor bolts w 2"x 2"x 3116" washers FRAMING NOTE: Engineered roof truss plan shall be ~/, /~o O ~f n n CJ~ on-site at time of inspection Walls Ceiling/Roof Rafter/Truss Positive Connection Weather Resistive Barrier FINAL f Final -Building (refer to permit #BLD00- ~'~ ~ ~r- ~lyQ, ~" i 1 021 for house construction Zd g 21 Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Yamit;YBID00-P21R:1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's retistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is. accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of sift fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aooroval must be received vrior to scheduline the Building Deyartment's final inspection. 7. Final Inspections- are required prior to occupancy. A Certificate of Occupancy is required for anon- residential project. S. All building permits expire if no progress bas been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active 9. POST THISPERMIT ON~ITE WITATHE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2 Waterman 8c I;n.+Huilding 181 Qonry 3tme1, Suite 301 Port Towmend, WA 98368 Phone: (360) 379-3208 Pax: (360) 385-9675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-O21 Issued: 2/21/0o Parcel Number: 951-902-704 Job Address: 4901 Emerald Court Zoning RR=1 Type: V-N Occupancy: R-3/U-1 (BLD00.021R-1) Total Occupant Load: 5 Nature of Work: Construct Single-family Dwelling (see BLD00.021R-1 for ¢araee) Owner: Steve and Amv Wilfona Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIliED: Electrical -Contact Labor & Industries @ 360-417-2702 a'QT~: Street and Utility Development Permit approval required prior to framing inspection ****All engineered details require inspection prior to cover**** REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition #2 Silt Fence as needed along Cook Avenue and NW property line Drive OfI'Mat to prevent sediment from leaving the site FOOTINGS Setbacks ~//O~ " Footings ~ ~ Forms Reinforcement Continuous Interior Footings (Preys C „ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 5 Pvmit # BLD00.d21 REQUIRED INSPECTIONS APPROVED/DAT E FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" squaze washers Vents -11 required Crawl Access Beam Pockets Engineered holdowns 3/ (~(o~ FLOOR FRA11-IING / NOTE: Engineered BCljoist plan shall be on-site n 'S/ ~~~t~ for the inspector at inspection time Girders Joists -engineered nailing with solid blocking N l R for floor sheathing at second floor over parch Blocking 6'l~ Positive Connection 6 Ic Treated Wood to Concrete Anchor Bolts & Washers a lc c glut IZ°P'`~ o l~- ll~ dd ~ ~ ~C jV ) j , Shield Under Posts r~ ( n Beam Pockets tf I ~ Girder to Concrete ~ (r_ Anchor Bolts & Washers plc FDN Vents o t~- PLUMBING: Rough-In (D-V-T & Clean Outs) Water Supply Water Hammer Arrestor @ clothes & dishwasher Gas Supply Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint -strap (a3 I/3 points . Pressure relief valve drain to exterior; 6" - 24" above ground • Ca1148 hours before you dig for utility liue locates 1-800-424-5555 Page 2 of 5 permit # HI D00.021 RF.(lT1TRRT) iNSPF.CTIONS APPROVED/DATE MECHANICAL LPG Fireplace -direct vent Whole House Fan -laundry room Source Specific Fan Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING: NOTE: Engineered nailing, strapping and ~~~ O /J/J ~ (~ blocking require inspection prior to cover Walls Engineered Shear Walls -see attached engineering for nailing & strapping Roof -engineered nailing Attic Venting -ridge & eave Ceilings Posts, beams & headers Windows -egress Windows -safety glazing Windows Ufactor - .39 or better NFRC window sticker must be on windows & doors at inspection fime Air Seal Fresh Air Intake (window) Door UFactor - .20 or better Rafter Positive Connection Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30 ) Wall (R-21) ili R 38) ~ C q , l`~ ~ ~I ~~/~ ng ( - e Baffles pal , ~ 4W' ~ Vapor Barrier: paint ~i ~ ~~ ; ~ " ° Crawl Space - 6 mil black poly Y/ DRY WALL NAILING Walls / / ~~(p/ ~~ Ceiling Enclosed Space Under Stairs Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Pcmit#HLD00-021 REQUIRED INSPECTIONS APPROVED/DATE DRAINAGE Stormwater to be directed to grass-lined swales at street per Street and Utility Development Permit FINAL LPG (Fire Dept.) Public Works Sign-Off Rouse Number Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building GENERAL 1. Contractors working on this project are required to have a Labor 8c Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required .inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works. requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building DenartmenYs final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 Permit # BLI700-021 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for of least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 .,