Loading...
HomeMy WebLinkAboutBLD00-020Wafmnan & Katz Building 181 Quinry St, Suite 301 Port Townsend, WA98368 Phone (360) 379-3208 Fax: (360) 379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-O2O Issued: 2110/00 Parcel Number: 990000103 Job Address: 1202 Lawrence Street Zoning: RR=II Type: VV=N Occupancy: A„=3 Total Occupant Load: No Change Nature of Work: Remove existing wood shingle roof, replace sheeting and install asphalt shingle roof. Owner: First Baptist Church Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill per plans or other location in accordance with all local, state and federal laws SHEATHING 7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1'/<" staples @ 6" o.c. edges and field. ROOF VENTING Net free ventilation area shall not be less than 1sf/150sf of the area of the space ventilated, if 50 percent of the required ventilation azea is located at least 3' above the eve or cornice vents the net ventilation azea may be lsf/300sf. Openings shall be covered with corrosion resistant '/<" mesh. FINAL House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pump #BLDOO~IyZd GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WTTH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2