Loading...
HomeMy WebLinkAboutBLD00-016Watelmett & KnzBuilding 181 Quieey Street, Suite 301 Port Towmeod, WA 98368 Phoee: (366) 379-3208 Fu: (360} 3796923 CITY OF PORT TOWNSEIVD CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-O16 Issued: 2/4/00 Parcel Number: 991403306 Job Address: 406 Benedict Street Zoning: CC=II Type: VV=N Occupancy: M Total Occupant Load: NC Nature of Work: Install Door. Owner: Mike Henry 379-4148 Contractor: Affordable Contractin¢ 385-2450 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical- Contact Labor & Industries @ 360-417-2702 REQUIItED INSPECTIONS APPROVED/DATE FRA)vIING Walls Air Seal FINAL Framing and Final maybe concurrent. Install 1 Van Accessible Parking Space (see attached handout). LJ Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 1 of 2 Pumit k BLD00-016 GF. .RA . CONDiTTONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11 38 5-2 29 4, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMian is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required Public Works aouroval must be received prior to schedulin¢ the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST TffiS PERMTT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2