HomeMy WebLinkAboutBLD00-016Watelmett & KnzBuilding
181 Quieey Street, Suite 301
Port Towmeod, WA 98368
Phoee: (366) 379-3208 Fu: (360} 3796923
CITY OF PORT TOWNSEIVD
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-O16 Issued: 2/4/00 Parcel Number: 991403306
Job Address: 406 Benedict Street Zoning: CC=II Type: VV=N
Occupancy: M Total Occupant Load: NC Nature of Work: Install Door.
Owner: Mike Henry
379-4148
Contractor: Affordable Contractin¢
385-2450
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical- Contact Labor & Industries @ 360-417-2702
REQUIItED INSPECTIONS APPROVED/DATE
FRA)vIING
Walls
Air Seal
FINAL
Framing and Final maybe concurrent.
Install 1 Van Accessible Parking Space
(see attached handout).
LJ
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 2
Pumit k BLD00-016
GF. .RA . CONDiTTONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11 38 5-2 29 4, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMian is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required Public Works aouroval must be received prior to
schedulin¢ the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST TffiS PERMTT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2