HomeMy WebLinkAboutBLD00-011Weinman g Katz Building
18] Q~dnry Staet Suite 301
PoR Towtue~, WA 98368
Phone (360) 379-3208 Fax (360) 385-7615
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-O11 Issued: 3/02/00 Parcel Number: 948315702
Job Address: 1726 Discovery Road Zoning: R_III Type: VV=N Occupancy: E=3
Total Occupant Load: 48 Nature of~'Work: Chanc e of Use - Sin ele-family residence to day care center
Owner: Laura Callaway
Contractor: Northwest Construction
7effPorter @ 301-4729
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOiTIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Minor Improvement Permit (prior to Framing Inspection) -See Public Works
RF.lITTTRF.iI TNSPF.C'TTnNR
APPROVED/DATE
DEMOLITION --- -- -- - - _
All construction debris to be deposited in approved
areas in accordance with local, state and federal
laws and ordinances
FOOTINGS /~.~ua-~,.~o .e'.~o~.~/
Deck Piers
3~~ot~
PLUMBING
One unisex barrier-free facility required -see
attached details for water closets, lavatories,
drinking fountain, etc.
Drinking Fountain
MECHANICAL
Source Specific Fans @ restrooms (or minimum 3'
opening)
Environmental Air Exhaust ducting, insulation
and terminus (located 3' from opening)
Fresh Air -via building openings (1/20 of floor
area) or provide mechanical ventilation
Page 1 of 3
INSPECTIONS APPROVED/DATE
Permit NBLDO0-011
FRANIING:
Walls
Stairs & handrails ;
Barrier free access
Exiting
- exempt from signage
- '/z" thresholds
- distance to property lines 10' minimum per
plans
Windows -safety glazing where applicable
INSULATION
Fill any exposed cavities
Vapor Barrier
DRY WALL NAILING
Walls
Ceiling
FINAL
Fire Department sign-off
Public Works sign-off
Pathway surfacing
Driveway markers
Electrical (L&n sign off
BCD sign-off(7eff Randall, 379-3208 x1124)
Pazking
Play yard fence
Street address posted per PTMC
Plumbing
MechanicaUHeating
Insulation Certificate if applicable
VaporBarrierPaint Certificate if applicable
Barrier Free Access: entry access from ROW, stairs,
handrails & extensions, ramps, thresholds, lever
hazdwaze, maneuvering space Q doors, restrooms,
B
ildi
ng
Final -
u
Restroom floor, walls & base:
7j/ / 3/D~
hazd, nonabsorbent surface
Decks
guazdrails
Page 2 of 3
Pemut llBLDW-011
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
deb°ris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
scheduline the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the Feld. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Page 3 of 3
~J
LJ