HomeMy WebLinkAboutBLD00-010
Waterman & Kslx BuOding
181 Quinty Slreeq Suite 301
Port Towmend, WA 98368
Phone: 360379)208 Fax 360379697)
CITY OF PORT TOWNSEND
s
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-OIO Issued: 1131!00 Parcel Number: 998-803-102
Job Address: 1019 49th Street Zoning: R_I Type: VV=N Occupancy: R~3
Total Occupant Load: add 1 Nature of Work: Addition to Single-family Dwelling
Owner: Larry Rice & Lorraine Kirsch Contractor: Steve Cooper Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
DTi (1TTT7?Ti T7 7NCPF("TT(lNC
APPRnVF,I~/ti7ATF
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2
Silt Fence as needed
Drive-Off Mat per attached details
FOOTINGS
Setbacks
Zf r 5/~~ r O
Footings / `'~
Forms
Reinforcement
Interior Continuous noting
FOUNDATION y~
Stem Wall
Forms
Z /l~'/~D ~' D
Reinforcement / ! `~
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Vents - 3 required
Crawl Access
Beam Pocket
Alternate braced wall panel (ABWP) holdowns
Call 48 hours before you dig for utility line locates
I-800.424-5555
Page I of 3
Building Permit kBLD00-0IO
RE UIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
Joists
Blocking Z~Z~~~ ~',
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
Foundation Vents - 3 required
MECHANICAL
Environmental Air Exhaust ducting, insulation
~ /~ ~ ~
(' [/
(R-4) and terminus (located 3' from opening) vl "`~~~~
FRAMING
Walls
Alternate Braced Wall Panel
Roof -Engineered truss plan to be on-site at
~ q
~ !~
time of inspection
Attic Venting -continuous ridge vent & soffit
vent
Ceilings
Posts, beams & headers
/
,~/~ (P/ O Q
/j
(_f(`
Windows Ufactor - .43 or better, new windows
NFRC window sticker must be on
windows & doors at inspection time
Air Seal
Rafter/Truss Positive Connection
Fireblocking
Weather Resistive Battier
INSULATION
Floor (R-30)
J/
Wall(R-19) ~
~ l/
Ceiling (R-38 )
Battles
~(
Vapor Barrier: poly plastic or faced Batts ~
Crawl space - 6 mil black poly ~ ~ QO
FINAL
House Number
Smoke Detectors
Deck Steps and Handrail
a lG „ ~(~ ~ ~~ ~ ~ aJ
f ~1~
Mechanical
Finat -Building
s',
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 3
Building Pmnit #BLD00-010
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
Z. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted 6y
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Cal! for at least one inspection per year to keep
your building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 3