Loading...
HomeMy WebLinkAboutBLD00-008"~ Watemun$KNZ Building ~ 181 Quincy Stns, Suite 301 - Pan Towmend, W A 983fi8 Phone: (360)379-3208 Faz: (360)379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD T$IS CARD MUST $E POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD~~-~O8 Job Address: 1424 12th Street Issued: 1/21/00 Parcel Number: 948-312-807 Zoning; R-III Type: VV=N Occupancy: R-3 Total Occupant Load: 4 Nature of Work: Construct single-family residence Owner: Habitat for Humaniri Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 • REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Z~ ~ ~~0 ~ Footings Forms Reinforcement Interior Footings Porch Piers UFER , ,,„ „/ /' n !~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 r~~ a s~oo-u3e ..` REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION St W ll em a Forms 2/2~ /~a ~ . ( Reinforcement 1 Beam Pockets Anchor Bolts w/ 2" x 2" x 3/16" washers Foundation Vents - 7 required Crawl Space Access FLOOR FRAMING Girders Joists Z~`~~00 Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers Foundation Vents - 7 required Crawl Space Access PLUMBING: n n Rough-In (D-V-T & Clean outs) 1 f 3~2 ~/~~ ( Water Supply l~ ( Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan -Bath or Utility Room / Z ~ „ n j ~ (~~ (`-'(/ SourceSpecific Fans ~ Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) Ca11 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 RF.niTTRFn 1NCPF.(''TinNS APPROVED/DATE Permit k BLD00-0OB FRAI4IING -Street and Utility Development permit to be issued prior to framing inspection ~~~ ~~'~ // /~ f~ ~f Walls ' l Ceilings Roof Rafter Positive Connection Attic Venting - eave Windows -escape Window safety glazing Windows Ufactor - .43 max. NFRC window sticker must be on windows at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-Factor - .20 max. Fire Blocking Weather Resistive Barrier INSULATION Floor (R=30) ~~ ~~~~ Walls (R=19 ) Ceiling (RR=38 ) Baffles Vapor Barrier: paint Crawl space - 6 mil black poly DRY WALL NAILING fL~~./Q~ /JQ 7 a l/~ Walls ( Ceiling FINAL Public Works Sign-Off House Numbers ~ S' 3[~ h.•~ '~- Plumbing ~ Mechanical/Heating Insulation Certificate ~ ~ 6I'''~~~ ~ ~ ~ 1 ~ r~ ~ A,p~ i t C if V B i P 1~" a n ert icate apor arr er f S ( ~ ~"` ~~ Smoke Detectors ~ Final-Building f'~-57r:~~:~ivG ~'va1~f; E~U~n '~ {/ ~ ^ ,~/ VJ ~ ~ ~r l ~ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Permit %BLDOO~A$.: ~ { ,~. 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may resuk in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re•inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Pu61ic Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. S. All building permits ezpire if no progress bas been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800.424-5555 Page 4 of 4