Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD00-003
Waterman & KaL Building 781 Quincy Street, Suite 301 Port rawtveM, WA 98368 P6orK: (360)379-3208 Fax: (360)379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION STI'E Ca11385-2294 for Inspection Permit Number: BLDOO-OO3 Issued: 1/27/00 Parcel Number: 984-904-401 Job Address: 710 P Street Zoning: RR=II Type: VV=N Occupancy: R-3 Total Occupant Load: 2 Nature of Work: Construct single-family residence Owner: LSPI Corooration Contractor: Vern Garrison Construction GENERAL CONDTI'IONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.n1TiRF,D TN~PF,("Ti()N~ TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 and Street and Utility Development Permit SUDP00-004 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~~ ~~U Footings Forms Reinforcement Interior Footings Pers~ /~ n E //~( / Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Permit k BLD00-003 `. REOUIItED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement ' (/' ~ O d (~ VC Beam Pockets ~ S b Anchor Bolts w/ 2" x 2" x 3/16" washers Foundation Vents - 4 required Crawl Space Access Alternate Braced Wall Panel holdowns FLOOR FRAMING Note: Engineered BCI joist plan to be on-site at time of inspection Girders Joists Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete. Anchor Bolts w/ 2" x 2"x 3/16" washers Foundation Vents - 4 required Drawl Space Access PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Gas Supply Hose Bibs (backflow protection required) Pipe Insulation (minimum R3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL LPG Heater ~~~~ / ©~ Whole House Fan -Bath Source Specific Fans Environmental Air Exhaust ducting (w/back draft dampers), insulation (min. R-4) and terminus located 3' from o enin J Call 48 hours before you dig for utility line locates I-800-424-5555 Page2of4 Pmnit p BLD00-003 uFnrrrul•,n nvcpF.rTTn~vc APPROVED/DATE _--- - - FRAMING ~ ~; / G NOTE: engineered roof truss plan to be on-site at time j/~~/v p ~ of inspection r i i Walls Alternate Braced Wall Panel Ceilings Roof Truss Positive Connection Attic Venting -ridge and eave Windows -escape Window safety glazing Windows Ufactor - .60 maximum NFRC window sticker must be on windows at inspection time Skylights Air Seal Fresh Air Intake (Window Ports) Doors U-Factor - .40 max. Fire Blocking Weather Resistive Barrier INSULATION Floor (R_l9) 3~ 3.Q t~ ' Walls (R~19) ' Ceiling (R=30 ) Baffles Vapor Barrier: vapor barrier paint Crawl space - 6 mil black poly DRY WALL NAILING ~ / 3 f Walls ` / Ceiling Enclosed space under stairs FINAL ff ` ~ j) Public Works Sign-O ?~ j~~ House Numbers Plumbing Mechanical/Heating Insulation Certificate Vapor Battier Paint Certificate Smoke Detectors Final -LPG Fire De artme~t Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Pmnit A BLD00-003 r ~ i 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required aker inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works auuroval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE VVTTH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 ram.