Ca14385-2294 for Inspection
Permit Number: BLDOO-OO2 Issued: 1/27/00 Parcel Number: 984-904-401
Job Address: 748 P Street Zoning: R_II Type: VV=N .Occupancy: R-3
Total Occupant Load: 2 Nature of Work: Construct single-family residence
Owner: LSPI Corporation
Contractor: Vern Garrison Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 and SIIDP #00-006
Silt Fence per approved red-lined plan
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS - deepen footingper attached ry ~
v
engineering ~
/~
i~
Setbacks
Footings
Forms
Reinforcement
Interior Footings
Por~ s np ,
~
,' `
G%~`-'~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
~.B~~~z
REQUIRED INSPECTIONS
APPROVED/DATE
FOUNDATION
Stem Wall
Forms
Q
~
Reinforcement ~ I
~
(
O`!!
Anchor Bolts w/ 2" x 2" x 3/16" washers
Foundation Vents - 6 required
Crawl Space Access
Alternate Braced Wall Panel Holdown Hardware
FLOOR FRAD~TG
NOTE: EngineeredB oistplan to be on-site at
~/(/~~
'
~~
time of
inspection
ZX ~ (~ ~~
Joists
Blocking
Shield under Posts
Positive Connection
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2"x 3/16" washers
Foundation Vents - 6 required
Crawl Space Access
PLUMBING:
Rough-In (D-V-T & Clean outs) 3~ ~~
_J+
Water Supply
Gas Supply
Hose Bibs (backflow protection required)
Pipe Insulation (minimum R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint - Z places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
LPG Heater 3~2 / `~
Whole House Fan -Bath
Environmental Air Exhaust ducting (w/back draft
dampers), insulation (min. R-4) and terminus
(located 3' from opening)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
PamitMBI.D00-002
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING
NOTE: Engineered roof truss plan to be on-site at ~~ ~ r~
J ~ /j
(~
time of inspection `
Walls
Alternate Braced Wall Panel
Ceilings
Roof
Truss Positive Connection
Attic Venting -ridge and eave
Windows -escape
Window safety glazing
Windows Ufactor - .60 maximum
NFRC window sticker musf be on windows
And skylights at inspection time
Skylights
Air Seal
Fresh Air Intake (Window Ports)
Doors UFactor - .40 max.
Fire Blocking
Weather Resistive Barrier
INSULATION ~
~ ~
Floor (R=19)
~Z
6
~ J
Walls (R 19)
Ceiling (R=30 )
Battles
Vapor Barrier: vapor barrier paint
Crawl space - 6 mil black poly
DRY R'ALL NAILING ~
~
~
Walls ~
~
Ceiling
Enclosed space under stairs
FINAL
Public Works Sign-Off
'f/J~~~~
~
House Numbers
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final - LPG (Fire Department)
Final -Building
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
A
Paovtk HLD00-OOj
1
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received Drior_to_
scheduline the Building Departments final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspeMions are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800.424-5555
Page 4 of 4
alley:
City of Port Townsend
I p_c~. Certiftcote Of Inspection
~.~. ~m.w w,a.
Permittee: !~ P/ ~~
OMr(N
.. , ~~~ ~ '
~m.n eM. sr. ao nnu.
Mechariical Permit No.:
Building~ermitNo.: ~iL1~D/7-FX~2
Installa#!on Type: ^ New ^ Container Change Only
^ Other:
Installation Data:
• Historical District Determination: N~i~
• U.B.C. Use Classification: ~'3
• Elements: O c ntaina(s) ~ Pipmg ^ Appliance(s) ^
• Container Size(rype: !~? f/~1~~'
• Container Serial No./Mfr. Dt.: ~ ~7PbD
• Other tank(s) Type, Size, S/B: ubN
• Test Pressure,Type:
• Appliance Mfr.(s)/MadeUSN(s): ~GD
Location(s): 1gDG
Listing(s): ~v~
Venting Type/L.oc.:
Miscellaneous: _
In spection Elements: P mil
• Container(s) 0
• Piping
Regulator(s) UUU~~~
~
^
• Apurtenances ,G~a/ ^
• Setbacks ~ l7 ^
• Appliance(s) ^ ^
• Venting ~j+jrl7~u- ^ ^
other ^ ^
Approval To Render Service:
^ Approved.
^ Conditional Approval:
~ot approved:
InspgGted Bv:
~~o,.cG.(~CO.
~~
']I4
~\
~~:
Plot Plan
1-~
`-`~ t1
SeAemaiic
~(A Comment /Code Reference
^
^
^
^ fiU7 ~ ,
^ ~co ~z .
., ~ ~ (ZZa
Date: ~ /~ / i~o
Tlme:
P""~ ~ Port Townsend Fire pepartment • LPG Inspection Form - OS/12FJ8
1
~~
a