Loading...
HomeMy WebLinkAboutBLD00-001Wetermao & I4h BoOdh,g 187 Quinry Sheet, State 301 Port Towwend, WA 98368 Photo: 360J793208 Fez 360x796973 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Call 385-2294 for Inspection Permit Number: BLDOO-OO1 Issued: 1/18!00 Parcel Number: 948312303 Job Address: 1322 12th Street Zoning: R-111 Type: VV=N Occupancy: R_3 Total Occupant Load: add 4 Nature of Work: Addition to Single-family Dwelling Owner: Rick Smith Contractor: Same as Owner ` ~~ ~ /~,1~~ GENERAL CONDITIONS APPLY -SEE LAST PAGE -~~jD t ..f~ / "7 SEPARATE PERMTI'S REOUII2ED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.nTTiRF.T) TNCPRC'TTt7NS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition #2 Silt Fence as needed Drive OffMat per attached details FOOTINGS Setbacks Z ~~Q~ `-'~- Footings Forms Reinforcement Interior Continuous Footing Deck Piers UFER FOUNDATION ~Z ~Ol D D Stem Wall Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" squaze washers Vents - 6 required Crawl Access Beam Pocket Alternate braced wall panel (AB WP) holdowns Call 48 hours before you dig for utility line locates 1-800-424-5555 Page I of 4 Building Permit #BGIXIO-0Ol REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRANIING NOTE: Engineered BCI plan to be on-site @ time of inspection ~~/ ©(7 Girders !!! joists Blocking Shield under Posts Positive Connections Girder to Concrete Beam Pockets or Post-to-Fdn. Wall Connection Treated Wood to Concrete Anchor Bolts & Washers Foundation Vents - 6 required PLUMBING: y ~ O Rough-In (D-V-T & Clean Outs) ~ /D Water. Supply Hose Bibs (backflow protection. req'd.) Pipe Insulation - R-3 Pressure Reduction Valve if> 80 psi MECHANICAL , / , / ~ ~ ' Whole House Fan -Master Bath / ~ ~f `1 Environmental Air Exhaust ducting, insulation (R.-4) and terminus (located 3' from opening) FRAMING Walls ~/~/O~ /~ n l~ Alternate Braced Wall Panel Roof -Engineered truss plan to be on-site at time of inspection Attic Venting -gable end & eave Ceilings Posts, beams & headers Windows -egress Windows -safety glazing Windows Ufactor - .39 or better, new windows NFRC window sticker must be on windows & doors at inspection time Air Seal Fresh Air - llrndow or Wall Ports Required Doors Ufactor - .20 mmc. RaRer/Truss Positive Connection Fireblocking Weather Resistive Barrier Ca1148 hours before you dig for utility line locates 1-80~-424-5555 Page 2 of 4 ~: ~~ Building Permit #BLD00-0Ol RF.f1TTTRFT) TN~PF.CTTnNS APPROVED/DATE INSULATION - -- -- - - ~~,,,/~ ' ~ ~~i/I- __ ~/~q/~ ~-~U~ ( ~~ %l.~' ' 7 Floor (R-30) l Wall (R-19 ) ` / Ceiling (R-38 ) Baf3les Vapor Barrier: faced Batts Crawl space - 6 mil black poly DRY WALL NAILING ~,(/ r Walls Ceiling Interior Braced Wall Panels FINAL ' House Number ~~ ~ ~~ ""~~ Plumbing Mechanical Smoke Detectors Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reEistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed an-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 ,.. Building Permit #BLD00-0Ol 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; n ti minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least erne inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4